Sign In | Join Free | My wpc-board.com |
|
Brand Name : FMS
Model Number : Double Layer
Certification : ISO CE
Place of Origin : CHINA MAINLAND
MOQ : 1 Set
Price : Negotiable
Payment Terms : L/C, T/T, D/A, D/P
Supply Ability : 20 Sets Per Month
Delivery Time : 30 Working Days
Packaging Details : 20' FLC
Product Name : High Quality Automatic Double Layer Roll Forming Machine Color Steel Tile Making Machine
Dimension(L*W*H) : 6*1.5*1.3 m
Raw Material : PPGI
Working Speed : 8-15 m/min
Rolling thinckness : 0.3-0.8mm
Shaft material : 45# steel
Pow supply : 380v/50HZ,3P, or customize
Profile : as customer requested
Cutting blade material : Cr 12 High Grade Steel
Control system : PLC(imported Brand)
High Quality Automatic Double Layer Roll Forming Machine Color Steel Tile Making Machine
Specification
Part Details | Item Name | Specification |
Material | Raw material | PPGI |
Thickness | 0.3-0.8 mm | |
Machine | Roller station | Depending on the customer's drawing |
Shaft diameter | 70 mm | |
Shaft material | 45# steel with 0.05mm chrome | |
Roller material hardness 30-40 HRC | 45# steel with 0.05mm chrome | |
Machine size | About 6×1.5×1.3 m | |
Machine weight | About 5.5 ton | |
Machine color | As the customer's request | |
Working speed | 8-15 m/min | |
Cutter | Hardness | 50-65 HRC |
Cutting tolerance | ± 1 mm | |
Material | Cr 12 | |
Operate | Hydraulic cutting | |
Power | Driving way | Chain 1 inch |
Main power | 5.5 kW | |
Pump power | 7.5 kW | |
Voltage | 380v/50HZ,3P, or customize as customer's request | |
Control system | PLC brand | Delta made in Taiwan |
Screen | Touchable screen | |
Language | Chinese and English or add language as customer need | |
Decoiler | Operation | Manual |
Weight capacity | 5 ton | |
Price | Free as Gift | |
Receiving table | Operation | Manual |
Length | 3 m | |
Price | Free as Gift |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
.
Payment terms
30% in advance as down payment
70% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
![]() |
Automated PPGI material Double Layer Roll Forming Machine Color Steel Tile Making Machine Images |